Sales Hotline 0800 009 6602

Delivery Details

Delivery costs within the UK Mainland are £6.95 ex VAT per order and items are delivered on a standard next working day service Monday to Friday by Courier. Deliveries to parts of Northern Scotland may cost more and take 2 to 3 days.
Features
G.652.D Compliant
Low smoke zero halogen cable
Yellow outer sheath
900 or 600?m 9/125?m duplex cable
Broad range of connectivity options
High quality connectors
Each cable is individually bagged and labelled
Receive and transmit legs clearly indicated
Factory terminated under ISO9001 quality control procedures
Delivers OS1 and OS2 Performance
100% Optical Test
Test Certificate with each cable
Batch Number Tracking

Product Overview
Excel duplex patch leads are manufactured from the highest quality G.652.D optical fibre, terminated with ceramic ferrule connectors of various types. The singlemode are compatible with OS1 & OS2 optical fibre channels. Cable preparation, termination and testing is carried out to strictly managed procedures in an Excel approved manufacturing facility. Applications include the connections between optical patching panels and network or server equipment and directly from devices to the local or wide area network or physical security equipment.

Each cable has strain relief boots to prolong and maintain performance levels of the assembly, transmit and receive 'legs' of each duplex cable are identified by means of ring type cable marker fixed to each end the assembly. A short distance from these identification rings heat shrink is applied to maintain an easy to manage bonded two fibre cable, finally a label containing a unique batch number is fixed to the centre of cable for quality and traceability purposes.

Availability
Excel duplex OS1 patch leads are generally available from stock in lengths from 1 to 30 metres. For requirements which may vary from this, such as specific length, colour or labelling requirements, please contact sales.

  • 0 items
Christmas & New Year Holidays

Christmas Orders & Deliveries For 2018

The last shipping day for Christmas will be Thursday 20th December.

Orders placed on Thursday 20th December will be delivered next day on Friday 21st December.

Our offices will be closed from 5.30pm on Friday 21st of December and will re-open at 9:00am on Wednesday 2nd January

Orders can still be placed online during the Christmas and New Year holiday, but will not be processed until Wednesday 2nd January for delivery on Thursday 3rd January

We would like to wish all our customers a very Happy Christmas and New Year

The Networking Store

Christmas & New Year Opening Hours

    Contact Us About Us Privacy Policy Terms and Conditions Shipping & Returns
We Accept
Secure & Safe Shopping

PayPal